Project Stats

Location: Vonore, Tennessee
Type: Large Residential
Size: 5,998 sq ft.
Total Construction: 300 Days
ICF Installation Time: 25 Days

Construction Team

General Contractor: Mike O’Hara
Form Distributor: Greg Birtsch
ICF Installer: Chuck parks
Architect: Scott Kinzy

Designed from the ground up to maximize energy efficiency, this residence combines the insulation properties of ICF construction with innovative “river loop” geothermal HVAC system which utilizes the nearby river as a thermal mass.

The home was designed from the beginning to leverage the logistical benefits of Nudura® ICF, since a special concern of both the homeowners and the builder was the environment impacts of materials transport.

Gallery