English (US) | Français (CAN) | Europe | Français (Europe) |

Alvaton Elementary - Bowling Green, Kentucky USA


Learn more about Alvaton Elementary and other net-zero schools built using Nudura insulated concrete forms:

 

  • Energy efficiency and conservation are top priority of the school district. As a result, numerous building systems and sustainable architecture concepts were evaluated and incorporated in the school.
  • These include: - Sandwich panel metal roof system, achieving an R-30 insulation value - Geothermal heat pump system - Lighting and HVAC occupancy sensors. - Green building finishes - Natural day lighting.
  • Two story K – Grade 5 elementary school with upper and lower classroom wings totaling 77,000 sq. ft. This project utilized Nudura® 12” on the gymnasium and 8” Forms on the core area of the building.



Project Stats

Location: Bowling Green, Kentucky USA
Type: Educational
Size: 77,000 sq ft

Construction Team

General Contractor: D.W. Wilburn
Architect: Sherman Carter Barnhart
ICF System: Nudura Inc.

  • Project Profile PDF

CONTACT US

We’re committed to supporting homeowners and design professionals who are interested in or use our products. We’re always happy to help and provide more information.